Text 6: Road construction
en.wikipedia.org›wiki/Road
Road construction requires the creation of a continuous right-of-way, overcoming geographic obstacles and having grades low enough to permit vehicle or foot travel and may be required to meet standards set by law or official guidelines. The process is often begun with the removal of earth and rock by digging or blasting, construction of embankments, bridges and tunnels, and removal of vegetation (this may involve deforestation) and followed by the laying of pavement material. A variety of road building equipment is employed in road building.
After design, approval, planning, legal and environmental considerations have been addressed alignment of the road is set out by a surveyor. Roads are designed and built for primary use by vehicular and pedestrian traffic. Storm drainage and environmental considerations are a major concern. Drainage systems must be capable of carrying the ultimate design flow from the upstream catchment with approval for the outfall from the appropriate authority to a watercourse, creek, river or the sea for drainage discharge.
A borrow pit (source for obtaining fill, gravel, and rock) and a water source should be located near or in reasonable distance to the road construction site. Approval from local authorities may be required to draw water or for working (crushing and screening) of materials for construction needs. The top soil and vegetation is removed from the borrow pit and stockpiled for subsequent rehabilitation of the extraction area. Side slopes in the excavation area not steeper than one vertical to two horizontal for safety reasons.
Old road surfaces, fences, and buildings may need to be removed before construction can begin. Trees in the road construction area may be marked for retention. These protected trees should not have the topsoil within the area of the tree's drip line removed and the area should be kept clear of construction material and equipment. Compensation or replacement may be required if a protected tree is damaged. Much of the vegetation may be mulched and put aside for use during reinstatement. The topsoil is usually stripped and stockpiled nearby for rehabilitation of newly constructed embankments along the road. Stumps and roots are removed and holes filled as required before the earthwork begins. Final rehabilitation after road construction is completed will include seeding, planting, watering and other activities to reinstate the area to be consistent with the untouched surrounding areas.
- Английский язык для аспирантов
- Введение
- Требования к кандидатскому экзамену
- Структура кандидатского экзамена
- Образец экзаменационного билета
- 3. Практические рекомендации к ответам на вопросы экзамена
- Фразы для резюмирования текста
- Примерный перечень вопросов о специальности и научной деятельности аспиранта
- Заключение
- Библиографический список рекомендуемой литературы
- Text 1: Portland Cement Production
- Text 2: a central heating system
- Text 3: Types of ventilation
- Text 4: Key elements of a fire safety policy
- Text 5: The automotive Industry
- Text 6: Road construction
- Text 7: Artificial intelligence
- Text 8: Production, cost, and efficiency
- Text 9: Public relations (pr)
- Реферат:
- Примерная структура реферата
- Contents
- Abstract
- Introduction
- Professional vocabulary / Терминологический тезаурус
- Modal verbs
- Cистема времен английского глагола
- Неличные формы глагола
- Оглавление
- Английский язык для аспирантов
- 3 94006 Воронеж, ул. 20-летия Октября, 84